August was crazy for me! I went on a backpacking trip, did my school summer project, and started school
I barely found time to work on the car, plus i was waiting for the adapter plate and coupler (which i sent back...)
Today (below this post) i wrote all the major things i did in the last month. I've also been working on getting a deal on batteries. Im currently in contact with a few dealers.
My plans to finish the car! (added to checklist on sidebar)
- Get a deal on batteries
- Fabricate battery racks
- Make a control box (containing the smaller components like fuses and contactor)
- Get new adapter plate
- fit adapter plate
- Mount motor with tranny
- wire the heater
- Wire everything else
- Mount everything else but batteries (controller, control box 12v charger)
- Get vacuum brake
- Mount gauges
- Set up emergency disconnect (circuit breaker)
- Mount battery pack charger in trunk
- Mount batteries
- test!
0 comments:
Post a Comment